Measuring strings

Share

A camera system is used to measure the strings, check the position of the bus bars and give the cells a final inspection. The robots position the strings optimally and the faulty parts are segregated for manual reworking. An optional electroluminescence test reveals micro cracks and functionally inefficient areas of the solar cells.

The procedure takes between eight and 20 seconds, depending on the scope of the test and the string size, at the end of which a clear quality analysis is available. In cell strings that have passed the test, the connecting strands are cut to size for the relevant deposition position in readiness for the subsequent process step, cross-soldering.

Popular content

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Share

Related content

Elsewhere on pv magazine...

Leave a Reply

Please be mindful of our community standards.

Your email address will not be published. Required fields are marked *

By submitting this form you agree to pv magazine using your data for the purposes of publishing your comment.

Your personal data will only be disclosed or otherwise transmitted to third parties for the purposes of spam filtering or if this is necessary for technical maintenance of the website. Any other transfer to third parties will not take place unless this is justified on the basis of applicable data protection regulations or if pv magazine is legally obliged to do so.

You may revoke this consent at any time with effect for the future, in which case your personal data will be deleted immediately. Otherwise, your data will be deleted if pv magazine has processed your request or the purpose of data storage is fulfilled.

Further information on data privacy can be found in our Data Protection Policy.