REC Silicon’s US plant restart hampered
05. October 2011 | Markets & Trends | By: Jonathan GiffordVertically integrated solar manufacturer Renewable Energy Corporation (REC) has had its restart plants held back by power outages. REC Silicon’s Moses Lake, Washington, was affected.
Operations at the plant were shut down on yesterday morning when the power went out both in residential and industrial properties in the Grant County. A reason for the loss of power has not been determined.
REC Silicon is presently restarting operations at the site and it anticipates that in three weeks full production, to previous levels, will be achieved. Because of the power outage 500 metric tons (MT) of production output is believed to have been lost. The annual polysilicon production target for 2011 has been revised down from 19,000 MT to 18,500 MT.
2011 has been a tumultuous year for REC with at least one long-term wafer supply contract being cancelled and the company has admitted that it is contemplating permanently closing three wafer facilities and one cell plant in Norway. Its Singapore wafer, cell and module plant, which was opened in November 2010, is continuing at full production.
To leave a comment you must first sign in or register your details
No comments have been submitted yet. Why not login or register and be the first?
Subscribe today!
Choose between a digital and print subscription from pv magazine publisher Solarpraxis AG’s online shop!
Most read
Opinion & analysis
Read our new guest article on India's new solar policies from NPD Solarbuzz.
Press releases
Want to publish your press releases for free? Simply log in or register, enter the information you want to appear and we'll publish it for you!


