Featured in The Land of the Rising Sun – 02-2014

Global FIT overview

Feed-in tariffs: A number of countries’ FIT schemes have slightly degressed heading into 2014. Also, Indonesia has opened bidding to take part in its new FITs.

Austria The Austrian feed-in tariff (FIT), available for PV systems between 5 and 350 kWp, was reduced to €0.125/kWh for rooftop and building-integrated (BIPV) systems, and €0.100/kWh for ground-mounted systems. The FIT is guaranteed for 13 years and rooftop and BIPV installations are also eligible for a 30% investment subsidy of up to €200/kW.Cyprus The …

pv magazine
This article is part of pv+
Subscribe digitally to unlock exclusive investigative reporting, expert insights, in-depth analysis, and premium background coverage. Your subscription also includes full access to the digital edition of our magazine.