UP: Solar recycling needs transparency
European industry association PV Cycle estimates a 10 MW solar site will eventually produce 700 tons of waste material. It is becoming increasingly clear that PV modules need end-of-life protocols – for the technology and material processing, and the regulatory environment.
Most of the easy wins for PV module recycling have already been made. Materials such as the aluminum or steel used for module frames and the copper used in wiring can be easily separated from a panel and already have well established recycling markets. Modules can be shredded at electronic-waste or other recycling facilities and …
Advertisement
Advertisement
Advertisement
Advertisement