Author
Lívia Neves
Livia is covering the energy sector, especially solar and wind, since 2012. She was executive editor of Brasil Energia magazine from 2019 to 2020. She has been editing pv magazine’s Portuguese newsletter since June 2021, as well as collaborating with the company’s other projects and platforms, writing about business, policies and technologies for solar energy in Brazil.
Advertisement
Articles written by Lívia Neves
Brazil to add 11.4 GW of solar in 2025 despite regulatory hurdles
Brazilian photovoltaic association ABSolar says solar capacity additions may fall 24% to 10.6 GW in 2026 from 15 GW in 2024, with regulatory barriers, high capital costs, and restricted self‑generation access slowing investment and reducing jobs.
Dec 11, 2025
Brazil adopts legal framework for battery storage
Brazil published Law 15.296 on November 25, establishing a series of changes to laws in its electricity sector including guidelines for the regulation of storage systems, tax exemptions and the reduction of import tax rates on battery energy storage systems and its components to zero.
Brazil distributed solar market set for lower annual additions in 2025
Brazil installed 6.4 GW of distributed solar capacity between January and September 2025, down 12% from the same period in 2024, and current installation rates point to about 8.5 GW for the full year as residential and commercial segments weaken and regulatory reporting delays persist.
Nov 24, 2025
Advertisement
Energy storage could cut Brazil’s electricity system costs 16% in 2029
Storage is essential to expand renewables penetration and ensure grid flexibility, according to a study by consultants PSR. Regulatory and tax barriers still limit the sector, however, and new revenue sources are needed to make projects viable.
Advertisement
Brazil tenders 50 MW of battery, solar and hybrid sites for isolated areas
Two lots were tendered, to serve communities in Amazonas and Pará, with BRL 312 million ($58 million) of equipment. In Amazonas, 20,165 MW will be installed via five solar and diesel-fired thermal generation sites. Pará will get a 30.1 MW battery, solar and diesel facility.
Advertisement