Skip to content

CdTe

IEA highlights solar’s dependence on Chinese copper processing

The sheer volume of new power lines which will be required to accommodate the rising tide of solar installations ensures copper has been included by the International Energy Agency on its list of minerals which must keep flowing if the energy transition is to stay on course. And it’s not production that’s the potential bottleneck.

3

CNBM wants to set up GW-scale production of CdTe solar panels in China

German PV production equipment provider Singulus will supply the vacuum coating systems for the new production. The Chinese conglomerate currently operates CIGS panel production facilities at four different locations in China.

First Solar signals interest in US tellurium supplies for solar panel production

Rio Tinto plans to spend nearly $3 million on a facility in Utah to recover tellurium, a critical mineral used in solar panels.

3

First Solar’s PV module tech completes 25 years of testing at NREL

“Determining how many years a solar panel will last can take, well, years.”

6

China could add 48 GW of solar next year – AECEA

The in-country analyst has revised up its expectation for this year and says a healthy unsubsidized project pipeline will keep the numbers ticking over in 2021. The spending plans necessary to ramp up renewables targets in the next five-year plan, though, could put the nation on a collision course with the EU.

1

First Solar posts strong Q2, sells O&M unit to NovaSource

Another stalwart of the solar industry was able to take the necessary precautions in order to maintain a sense of normalcy during the pandemic, leading to a quarter of increased sales, net cash, and a positive outlook to finish off the year.

The PV world ten years ago – summer series part II

pv magazine editor Pilar Sánchez Molina recalls news from the PV sector of ten years ago as part of a new series. The insights offered will not only bring back memories for the pioneers of that exciting, challenging period but may also offer an idea of where we could be in 2030.

Jetion Solar completes 2 GW site

The Chinese state-owned manufacturer has started operations at its 1 GW mono PERC cell line after installing a 1 GW module fab last year.

2

New method for life cycle assessment of PV technologies

Researchers in Australia have conducted a ‘cradle to grave’ life cycle assessment (LCA) of the four most widely used PV technologies. The academics say that cadmium telluride solar modules have the lowest life cycle impact, followed by amorphous, multi and monocrystalline silicon products.

2

New CdTe panel manufacturer

U.S.-based Toledo Solar is trying to distinguish itself from First Solar’s cadmium telluride dominance by operating in the residential and commercial segments, which have long been unkind to the technology.

2

This website uses cookies to anonymously count visitor numbers. View our privacy policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close