Malian gold mine to be powered by 3.9 MW/2.6 MWh solar-plus-storage plant

The solar-plus-storage facility will be linked to the mine’s existing thermal power plant and is expected to reduce the cost of the kilowatts currently consumed by its operations by $0.04. The project developer is British oil provider Vivo Energy.