Solar Steel signs 200 MW Tagus project with Iberdrola and begins supply

Share

Gonvarri Solar Steel closes the supply of RackSmarT fixed structure for a new 200 MW project with Iberdrola.  

Tagus project, located in the town of Alcantara (Caceres), consists of 9,684 RackSmarT fixed structures and 307,584 panels for an annual energy generation of 313,650 MWh, which is equivalent to the energy supply for 100,000 homes in Extremadura (Spain).  

These figures will generate enough renewable energy to save 43,250 tons of CO2 in the atmosphere.  

With this project, Gonvarri Solar Steel confirms its position as one of the fastest growing and most environmentally committed suppliers of solar structures in the international and national market.