Engie commisions 140 MW Bhadla plant, signs 250 MW solar PPA in India

Share

On the inauguration of the 75 MW (100 MWp) Mirzapur solar PV plant on March 12, Isabelle Kocher, CEO of Engie, commented, “It is an honor to welcome President of France, Emmanuel Macron and Prime Minister of India, Narendra Modi to Mirzapur, one of our key assets in the country.”

Engie was awarded the Mirzapur solar project in May 2016 for a price of INR 4.43/kWh (~$0.068/kWh) and signed a 25-year power purchase agreement (PPA) with the Solar Energy Corporation of India (SECI) in June 2016.

Read the rest of the article on pv magazine India.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Waaree unveils 730 W dual-glass heterojunction solar module
07 October 2024 Waaree has showcased an n-type dual-glass photovoltaic panel with a power conversion efficiency of up to 23.5%.