Featured in Building resilience – 04-2026

Solar charging in the sub-Arctic

Easee has put its foot to the floor in 2026, completing a pilot project with Subaru that demonstrates the viability of solar-powered electric-vehicle charging in the harsh winter conditions of Canada’s Northwest Territories. It follows a collaboration between Easee and the Japanese car manufacturer in 2025 that saw the two companies deploy an electric vehicle charger on the South Atlantic island of Saint Helena, billed at the time as the world’s most remote electric-vehicle charging infrastructure. Adam Dunwoodie, technical manager at Easee UK, told pv magazine that locating the latest project in Canada’s Northwest Territories has enabled a pilot project to push the technology another step further.
Solar can effectively charge electric vehicles, even in the coldest climates. | Image: Easee

The demonstration was carried out with assistance from contractors Arc Electric and Solar Installations, based in Yellowknife, the capital of the Northwest Territories. The team installed a test rig of four PV modules tied to a battery and inverter system. This proved capable of charging a Subaru ­Solterra EV independently of any kind of grid …

pv magazine
This article is part of pv+
Subscribe digitally to unlock exclusive investigative reporting, expert insights, in-depth analysis, and premium background coverage. Your subscription also includes full access to the digital edition of our magazine.