As Mozambique depends on diesel generators to meet the national electricity demand, this country is contracting the power supply due to the rising costs of fossil fuels. The energy issue cripples economic of Mozambique economic development and paralyzes its citizens’ normal lives. The Mozambican are experiencing regular and more frequent power outages that can last for as much as 22 hours. Such an urgent situation stimulates the need for renewable energy installations.
This microgrid project combing both 103KWp of JinkoSolar’s Tiger Neo PV panels and 690KWh of JinkoSolar’s energy storage systems offers great potential to solve local energy issues. This solution is highly integrated with both PV, Power Conversion System, and batteries, simplifying the installation process. The modular design also enables a more flexible configuration of batteries so that customers can choose the best-fit one for their needs.
Their successful delivery also shed light on mitigating the national power shortage situation with PV and storage capacities with PV plus battery solutions.