SCOTRA signs a contract to install second-phase Floating PV System in the SVRG’s industrial pond in Vietnam

Share

Previously, SCOTRA has engaged a contract with SVRG (Saigon Vietnam Rubber Group) on Sept, 2021 for installation of 0.5MW floating PV system at the same location and with including 3.5MW installation contract this time, SCOTRA will install 4MW in total at the industrial pond at Phuocdong Industrial complex.

The client, SVRG has planned to produce maximum power generation within this small industrial pond (49,621㎡) with applying First Solar’s 460W module (weight 38Kg, a series 6 model of USA First Solar)

Global solar module companies are increasing power generation capacity to enhance efficiency. Recently, solar module with 670 wattages is being produced, which is an important factor in reducing the LCOE cost of solar power generation.

SCOTRA has recently launched an economical stackable floater and actively participating in overseas floating PV project beyond domestic market such as in Southeast Asia, Middle East, and Taiwan.