Enertis Solar to provide Acciona with quality control service for PV panels

Share

Acciona selects Enertis Solar to perform an exhaustive quality control on manufacturer's premises of solar PV panels which will be installed in two solar photovoltaic projects with a total power of 118MWp.

The Spanish company, specialized in consulting, technical services and engineering in the solar sector, will perform in China the quality control of PV solar modules throughout the production process and the finished products analysis to guarantee its optimal functioning before Acciona builds the two solar PV farms located in Australia (24 MWp) and South Africa (94 MWp), in this case with Acciona JV Oakleaf.

Enertis Solar will conduct the assurance quality control during production process at the manufacturer's factory and with an external laboratory. It will inspect the materials and conduct a full control of the production process, including a complete check of the calibration using modules previously tested as well as random tests of specific samples throughout the whole process.

Enertis will carry out the works during 36 weeks, after completion of the inspection, in the Jinko Solar's factory in Shangrao, Jiangxi.

In order to minimize uncertainties in the panels functioning, the assurance quality control of the modules will be completed during the construction stage with periodical tests onsite.

10,000 panels will be tested with a simple selection during the production and

shipment process. This contract is one of the largest of its kind in terms of volume.