Skip to content

SECI launches tender for manufacturing capacity

The government’s Solar Energy Commission of India (SECI) has tendered 5 GW of solar manufacturing capacity to be set up across the country. The capacity will be linked to grid-connected PV projects with the plants developed on a build-own-operate basis.

1

India’s rooftop sector still lagging behind

With barely 1.8 MW solar power (roof top) achieved in the first month of the 2018-2019 financial year, against the end of year target of 1000 MW, India’s solar dreams are hitting massive rooftop blocks. Grid-interactive solar power (ground mounted) has fared better, achieving 231.81 MW against the EoY 10 GW target.

1

India’s MNRE to support 2.5 GW wind-solar hybrid projects

India’s Ministry of New & Renewable Energy has announced a Scheme for setting up of 2.500 GW Inter-State Transmission System (ISTS)-connected wind-solar hybrid projects.

2

India announces new policy for wind-solar hybrid systems

India has unveiled a national wind-solar hybrid policy that provides a framework for promotion of large grid connected wind-solar PV systems for optimal and efficient utilization of transmission infrastructure and land, reducing the variability in renewable power generation and thus achieving better grid stability.

This website uses cookies to anonymously count visitor numbers. View our privacy policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close