Case for optimization

This 10 kW rooftop installation in Hyderabad, India was used as a case study by Soreva Energy to demonstrate the usefulness of MLPE in improving performance. The study showed an average 12% boost to output and a payback period of around 28 months.
Image: Soreva Energy
Stay informed
pv magazine is the leading trade media platform covering the global solar photovoltaics industry. Log in or purchase a digital or print version of this issue to read this article in full.