Intersolar Europe 2013: Repowering of solar farms and large rooftop installations

Share

Increasing plant performance through Solar Repowering Many solar power plants do not perform optimally. The reasons for lower yields are usually planning errors, installation mistakes, component failures or substandard technical management.

"On behalf of the owner, we first examine the actual performance of a solar power plant and create a repowering analysis," said Dr Gerwin Dreesmann, Managing Director of ProjectQuality4t2. In the second step, the proposed measures are implemented in coordination with the plant owner. "With increasing age of many solar farms, we see a strong increase in demand in Europe over the next years," said Dr Gerwin Dreesmann.

At present, various repowering projects for investors in Germany and Italy are already being implemented by the Germany-based company. Exclusive fair offer: Free initial performance check ProjectQuality4t2 will exhibit at Intersolar Europe in Munich from 06/19/2013 to 06/21/2013. The company presents itself on the booth "Solar Innovations – Made in Germany" hosted by the Federal Ministry of Economics and Technology in Hall B2, Booth B2.170L.

In addition to detailed service presentations, investors and banks will be offered a unique trade fair service: The free initial performance check of their plant during the exhibition period. In case an investor brings real 15-minute production data directly to the booth, he receives a qualified initial assessment of the current plant performance within a few hours.

www.project-quality.biz