The Solar project has been built on the building’s carpark area providing shading to vehicles during the day. Excess energy generated by the PV plant is stored in Tesla powerpacks minimizing the cost of diesel consumed by generators. In this project, OFGEN innovative financial model allows the end customer to pay for energy consumed ensuring immediate savings.

The project uses a TESLA powerpack for storage and is in line with UAP Old Mutual’s environmental sustainability program. The company is looking to benefit from the energy savings this renewable energy source will bring.

“We are proud to have been pioneers locally in implementing about 10MWhrs of industrial-scale storage solutions for our on-grid and off-grid clients resulting in onsite stable power supply and cost savings,” said Jibril Omar, OFGEN’s Chief Executive Officer, and Commercial Director.

The UAP Old Mutual Equatorial Tower was completed in 2015, with Old Mutual being among the first tenants. It is located on Unity Avenue in the Hai Neem Area, Juba, South Sudan, opposite the Cambridge International School, and about 100 meters from City Mall. The building is open for occupation.

PROJECT INFO

  • Client: UAP Old Mutual Project: Equatoria Tower Location: Juba, South Sudan Construction: 2021
  • PV system Size: 338.57 kWp Storage Size: 0.75 MWh

Components:

  • Modules: Jinko Solar
  • Inverters: SMA
  • Storage: Tesla Powerpack
  • Mounting Structure: Caracal Engineering SA
  • Others: Solar world/Rubicon