A universal composition

Share

The modularly-designed PVD coating concept has flexible systems for the majority of technological requirements and commercially available substrate sizes in the industry.

The new system modularly integrates upstream and downstream equipment. With the easy-to-reach distant by using sputtered TCO-glass or through large-area coating, costs can be reduced.

Scaling-up the coating area from 1.4 to 6.1 square meters can lead to a cost reduction of 35 percent according to the company.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

The case for combining pumped-hydro storage with floating PV

23 January 2025 Researchers in Italy have analyzed the techno-economic viability of enhancing three pumped hydro plants in Italy with floating PV on the lower basin...

Share

Leave a Reply

Please be mindful of our community standards.

Your email address will not be published. Required fields are marked *

By submitting this form you agree to pv magazine using your data for the purposes of publishing your comment.

Your personal data will only be disclosed or otherwise transmitted to third parties for the purposes of spam filtering or if this is necessary for technical maintenance of the website. Any other transfer to third parties will not take place unless this is justified on the basis of applicable data protection regulations or if pv magazine is legally obliged to do so.

You may revoke this consent at any time with effect for the future, in which case your personal data will be deleted immediately. Otherwise, your data will be deleted if pv magazine has processed your request or the purpose of data storage is fulfilled.

Further information on data privacy can be found in our Data Protection Policy.