India: Adani to expand its module and cell manufacturing facility to 2 GW

Share

Acknowledging the sector's vast potential, Adani is planning to expand its solar PV module and cell manufacturing facility to 2 GW, CEO, Adani Green Energy Ltd, Jayant Parimal told pv magazine in an exclusive interview.

Currently, the Gujarat-based renewable firm has 1.2 GW of operational module and cell capacity at its Mundra Solar PV Ltd (MSPVL) factory, located in one of the world's largest Special Economic Zones at Mundra, Gujarat, India.

Read the rest of the article on pv magazine India.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Anker Solix launches 7 kWh plug-in battery targeting rooftop solar retrofits
09 April 2026 The new Anker Solix Solarbank Max AC steps up from balcony-scale storage with a 3.5 kW inverter, plug-in capabilities for do-it-yourself (DIY) ease of...