Trina Solar to expand n-type ingot capacity by 35 GW

Share

Trina Solar has revealed that it aims to raise CNY 8.8 billion ($1.3 billion) by issuing convertible corporate bonds. It said it will use the net proceeds from the operation to expand its n-type ingot capacity at a new factory in Xining, in China's Qinghai province.

The factory will have an annual capacity of 35 GW. The required investment for its construction is about CNY 8.58 billion, of which CNY 6.28 billion will come from the bond issuance.

Trina Solar said it will be the factory in two 15 GW phases. Completion is scheduled within 24 months from the start of construction.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

How long do residential solar inverters last?
24 July 2024 Multiple factors affect the productive lifespan of a residential solar inverter. In Part 2 of our series, we look at solar inverters.