Skip to content

Press Releases

Publish your press releases, for free, directly through our client portal. You can find instructions for creating an account and uploading articles, here.

Guangke &Juya Solar Power Plant contracted by Surpass Sun connected to the grid successfully

Qinghai Guangke 20MWp solar power plant generally contracted by Surpass Sun was officially connected to the grid and four days later, another EPC project-the 20MWp Juya solar power plant was also connected to the grid. It has generated electricity of 350,000 kWh and 460,000 kWh for Guangke plant by the end of July and the number keeps ascending steadily. Previously, the two solar power plants have passed the acceptance inspection of the expert panel organized by Qinghai Province and Hainan State Power Corporation. Juya and Guangke solar power plant are located in PV power generation park of Gonghe County in Hainan State, Qinghai Province. Both of the two plants adopted 500kW PV grid inverters, intelligent combiner boxes, intelligent remote monitoring system and other core technical equipments independently developed by Surpass Sun. Another highlight of Juya solar power plant is the application of Magic system technology exclusively developed by Surpass Sun in the industry, which makes it different from traditional PV power stations. This technology including Magic Box panel technology, angle-adjustable Magic Bracket technology and Magic Inverter technology enables a 10% more yield of solar power. In addition, the two solar power plants also used Surpass Sun’s remote monitoring systems as well as advanced GPRS and WIFI wireless communication technology, which greatly improves the reliability of the system and makes them intelligent solar power plants. Link: http://www.sse-china.com/About/News_Detail-49.aspx
http://www.sse-china.com/About/News_Detail-49.aspx

IBC SOLAR receives recertification from TÜV Rheinland

DIN EN ISO 9001 certification extended to the scope of “product development”.

First Solar and Roseville sign contract for Lost Hills PPA

The 10-year PPA will be effective in 2015.

Fronius and Loxone offer comprehensive energy management system

Frounius International GmbH and Loxone have teamed up to provide customers of both companies a comprehensive energy management system. As a result, customers will be able to increase their self-consumption and cut costs.

Dust mitigation key part of plant engineering and construction for PV plants in USA

As the appetite for utility-scale solar increases across the USA, solar plants are being developed on more unusual terrains. Recent work in Arizona’s Antelope Valley has led to serious concerns over large dust clouds affecting local residents’ health and quality of life.

Service providers key to high-performance, secure plants in Chile

With over 100MW of plants now at advanced stages of development, companies are contracting for the logistics and services needed to ensure secure and profitable plant performance in Chile.

28th EU PVSEC: SINGULUS will present new Machines for PV Cells

• Coating Machine for Rear Side Passivation of PERC rnWith vacuum coating machine SINGULAR XP cell efficiency increased by up to 1 %; PERC cells with efficiency levels of more than 20 % possible.rn• System for Buffer Layer Deposition of CIGS Thin-Film Solar CellsrnDevelopment machine of the TENUIS enables significant cost savings over market standard.rn

JA Solar unveils new cell technology

JA Solar p-type mono-Si solar cells have surpassed 20% conversion efficiency.

3D-Micromac develops new laser system for PERC cells

Innovative on-the-fly technology makes it possible to achieve an unbeatable cost-benefit ratio. The system is modular, combinable with different laser-source technologies, and achieves a typical efficiency increase up to one percentage point.

Clenergy's solar system withstands Queensland tornados in Australia

PV-ezRack SolarTerrace III have survived a series of Tornados.

This website uses cookies to anonymously count visitor numbers. View our privacy policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close