Through the tender, the French government intends to allocate 200 MW for ground-mounted PV plants up to 30 MW, and 100 MW for rooftop solar systems up to 8 MW. Projects financed through crowdfunding will be granted the €3/MWh bonus, which is also included in all of the national tenders.
The annual budget for solar rebates has been raised from SEK 390 million to SEK 915 million (US$102.5 million). Additional funds are intended to spur more growth and reduce waiting period for applicants.
The project – the largest storage system using second-life and new electric vehicle batteries installed at a commercial building in Europe to date – was developed in partnership with Eaton, BAM and The Mobility House. pv magazine was present at the commissioning ceremony.
The improvement to the country’s power infrastructure is planned to enable the integration of renewable energy IPP projects under the recently-signed PPAs, as part of the REIPPPP program.
Aton is offering batteries to be integrated with photovoltaic systems for residential customers. Italian bank Intesa Sanpaolo also invested in the company.
The announcement was given by the French energy company during the #PlaceAuSoleil initiative, a new plan of France’s government to speed up PV development, and to make surfaces for large-scale solar plants available. The new package of measures includes doubling the volume of tenders for PV projects on agricultural land and increasing by 50% the volume of tenders for rooftop PV.
The upstream technology company plans to sell silicon carbide for applications including advanced inverters for solar and battery storage, as part of a new emphasis on materials supply.
The Spanish renewable energy company will sell power to a local glass container producer for a year and a half. The electricity will be provided by its 45 MW solar park in southern Portugal, as well as by other wind power facilities.
The huge 1.2 GW PV facility is currently being planned in the Lot-et-Garonne Department, southern France. The project’s required investment is expected to reach around €1 billion. Five big solar players are currently interested in developing the plant.
The manufacturing facility is aiming to produce enough glass to satisfy production of approximately 3.7 GW of solar PV modules per year. The company is also planning to build a 2 GW module factory in Zhangjiagang.
This website uses cookies to anonymously count visitor numbers. View our privacy policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.