Especially for ground mounted

The company states that this system has a simple and short planning process and the basic data is all that is required to select and order the right version. Delivery is also possible within 24 hours. The mounting system offers high stability without concrete or piling needed. There is no large machinery that is needed during mounting either. To install the mounting system, each pile is set and aligned in a previously prepared pit with a depth of 0.7 m. The pit is then filled layer by layer with the excavated earth and compacted. Only three further steps are required until the system is complete: screw the cap onto the ground pile, mount the rails and finally, clamp the modules. A modular extension is possible as well whenever needed.

www.creotecc.de