India’s SECI tenders 100 MW floating solar plant

Share

From pv magazine India

SECI has launched a tender to build a 100 MW (AC) floating solar project at Getalsud Dam, Ranchi district, Jharkhand.

The contract will cover engineering, supply, construction, and commissioning of the floating solar project, along with 10 years of plant operation and maintenance. The project should be commissioned within 18 months of the signing of the contract.

SECI has already secured financing from the World Bank. Prospective bidders have until May 2 to submit their proposals.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Vertical bifacial PV outperforms tilted PV systems in the UK
15 April 2026 A year-long study in the UK finds vertical bifacial PV systems achieve an up to 26.91% higher output during morning hours compared to traditional tilt...