Gurīn Energy completes 75 MW solar project in the Philippines

Share

Singapore-headquartered renewables developer Gurīn Energy has finished a 75 MW solar plant located in Palauig, in the northeastern Zambales province of the Philippines.

It is the company’s first operational project and features over 136,000 ground-mounted solar panels across an 80-hectare site. 

It is owned by Shizen Inc, a fully-owned subsidiary of Gurīn Energy, which has a partnership in place with power company AboitizPower’s retail electricity units Adventenergy Inc and Adventpower Inc for the offtake from the solar farm.

Bob Driscoll, Chief Operating Officer at Gurīn Energy, said the project was part financed by UnionBank of the Philippines, the company’s solar bank partner.

Gurīn Energy says the project forms part of its pipeline of solar, wind and storage projects currently at various stages of development across Indonesia, Singapore, Thailand, the Philippines, South Korea and Japan that totals 7 GW in capacity.

pv magazine recently reported that the Philippines added 820 MW of solar in 2024, a record in a calendar year for the country.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Daikin launches new single-zone heat pumps for residential use
20 June 2025 The new Oterra 115V heat pumps use difluoromethane (R32) as the refrigerant and have a heating capacity of 9,000 BTU/h to 12,000 BTU/h.