China Electric Equipment Group awards 7.2 GWh of storage cells in tender

Share

From ESS News

China Electric Equipment Group has published the results of its 2025 centralized procurement for energy storage cells, with almost the entire 7,248 MWh tender awarded to 314 Ah products. The tender was divided into 10 packages, the tender covered cell capacities of 50 Ah, 100 Ah, 280 Ah, and 314 Ah.

The scale is notable not only for its size, but because smaller-format packages of 50 Ah (total 16 MWh) and 100 Ah (total 32 MWh) attracted no bids. These cell types often serve behind-the-meter or smaller distributed and grid applications.

To continue reading, please visit our ESS News website.

 

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

World’s first high-power aluminum-ion battery system for energy storage
05 December 2025 For the first time, a complete aluminum-graphite-dual-ion battery system has been built and tested, showing that lithium-free, high-power batteries ca...