The Port of Rotterdam is set to host a 100 MW electrolyzer from 2025, with a feasibility study expected this summer. The project will produce green hydrogen and will eventually be expanded to 500 MW.
The country’s cumulative installed PV capacity reached 1.7 GW at the end of 2019, as a result of the grid-connected projects tendered by the Russian government between 2014 and 2019. The remaining 500 MW quota of the 2.2 GW tendering scheme should be assigned this year.
A new report establishes the feasibility of wind-solar-storage hybrid projects over new coal plants in the Indian states with high renewable energy potential. Tamil Nadu was chosen for the technical and commercial assessment.
The Western Australian government has called for expressions of interest for its proposed 1.5 GW solar-wind-hydrogen hub at the Okajee Strategic Industrial Area. This week, it said that 65 companies from around the world are interested.
Switzerland’s Smartvolt has developed a special mounting system that facilitates the quick deployment of small ground-mounted PV systems at the base of wind turbines.
Australian researchers have identified more than 600,000 sites suitable for closed-loop pumped-hydro energy storage projects across the globe. “Off-river” pumped-hydro is not only able to overcome the typical topographical issues of conventional pumped-hydro but is also cheaper.
Overall, the Polish energy regulator has allocated 1.7 GW of renewable energy capacity in a procurement exercise that was open to projects exceeding 1 MW in size. The auction concluded with a lowest price of $0.051/kWh, slightly up from the auction of the same kind held last year.
Scientists in Qatar have developed a new model for setting up standalone EV recharging stations based on the hybridization of multiple renewable energy sources and different types of storage. The system includes power generation devices from CPV/T, wind, and biomass and is designed to fast-charge 80 electrical vehicles daily.
Copenhagen Infrastructure Partners and Hydrogen Renewables Australia have agreed to develop the 5 GW Murchison Renewable Hydrogen Project in Western Australia. It will use PV and wind to produce hydrogen fuel for export to Japan and South Korea.
The proposed 26 GW Asian Renewable Energy Hub in Western Australia gained federal government support last week. Construction is expected to start in 2026.
This website uses cookies to anonymously count visitor numbers. View our privacy policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.