India to annually tender 50 GW of renewables over next 5 years

The structured bidding trajectory of India’s tenders will provide sufficient time for renewables developers to plan their finances, develop business plans, and manage the supply chain more efficiently, says Indian Power Minister R.K. Singh.
Image: Acme Solar

From pv magazine India

Indian Power Minister R.K. Singh says the government has decided to accept bids for 50 GW of renewable energy capacity per year from fiscal 2023-24 to fiscal 2027-28. The annual bids to set up renewable energy capacity for the inter-state transmission system will also include at least 10 GW of wind projects per year.

The Ministry of New and Renewable Energy (MNRE) finalized the plan at a recent meeting chaired by the power minister. The plan is in line with India’s target of 500 GW of installed electricity capacity from non-fossil fuel (renewable energy and nuclear) sources by 2030.

India had installed 168.96 GW of cumulative renewable energy capacity by Feb. 28, 2023. This includes 64.38 GW of solar power, 51.79 GW of hydro, 42.02 GW of wind, and 10.77 GW of bio power. About 82 GW is under various stages of implementation and about 41 GW is in the tendering stage. 

“The structured bidding trajectory will provide sufficient time to the RE developers to plan their finances, develop their business plans and manage the supply chain more efficiently,” said Singh.

The power ministry has also declared a quarterly bid plan for fiscal 2023-24. It will include bids for at least 15 GW of renewable energy capacity in each of the first and second quarters of the financial year, and at least 10 GW in each of the third and fourth quarters.

Solar Energy Corp. of India (SECI), NTPC, and NHPC are the government-notified “renewable energy implementing agencies” (REIAs) that can accept bids. The ministry has also decided to allow SJVN, a public sector enterprise under the government of India, to serve as one. 

The targeted bid capacity for fiscal 2023-24 will be allocated among the four REIAs. The REIAs will be allowed to bring out bids for solar, wind, solar-wind hybrid capacity, andn round-the-clock renewable power services with or without storage.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: [email protected].

More about
Written by

Comments

India Plans 5 Annual Tenders for 50GW of Renewables – PV Mag
Jul 10, 2023

[…] Read the full report: PV Magazine. […]

India to annually tender 50 GW of renewables over next 5 years – baxter live news
Apr 18, 2023

[…] Read More […]

PĂ­ldoras solares: planta flotante en Indonesia, crecen en Francia los precios en las licitaciones e Irlanda contrata almacenamiento – pv magazine Latin America
Apr 14, 2023

[…] India licitarĂ¡ anualmente 50 GW de energĂ­as renovables en los prĂ³ximos 5 años La trayectoria estructurada de las licitaciones indias darĂ¡ tiempo suficiente a los promotores de energĂ­as renovables para planificar sus finanzas, desarrollar planes de negocio y gestionar la cadena de suministro de forma mĂ¡s eficiente, afirma el Ministro de EnergĂ­a indio, R.K. Singh. […]

Energy Shift: India to surpass China in oil demand – Stewarding Energy
Apr 09, 2023

[…] to annually tender 50 GW of renewables over next 5 years | pv magazine The structured bidding trajectory of India’s tenders will provide sufficient time for renewables […]

India Plans 5 Annual Tenders for 50GW of Renewables – PV Mag – asiabusinessalert.com
Apr 08, 2023

[…] Read the full report: PV Magazine. […]

India will annually offer 50 GW renewables in the next five years – 24News
Apr 07, 2023

[…] Continue reading […]

India to every year tender 50 GW of renewables over next 5 years – news
Apr 07, 2023

[…] Find out more […]

India to annually tender 50 GW of renewables over next 5 years – Broward Tribune
Apr 07, 2023

[…] The structured bidding trajectory of India’s tenders will provide sufficient time for renewables developers to plan their finances, develop business plans, and manage the supply chain more efficiently, says Indian Power Minister R.K. Singh…Read More […]

India to annually tender 50 GW of renewables over next 5 years – News All Today
Apr 07, 2023

[…] original source: India to annually tender 50 GW of renewables over next 5 years […]