US: S&C contracted for 7 MW energy storage facility

Share

The project, to be located in Minster, will be implemented on behalf of HMV and the Village of Minster. When complete, it will be tied to an adjacent 4.2 MW solar PV project, owned by HMV. It is expected to be the U.S.’ largest solar+storage system of its kind. No date was provided for completion, however.

S&C will supply its PureWave Storage Management System, which will provide power conversion for 3 MWh of lithium ion batteries. The system consists of a master control system and a 2-MW/2.5-MVA power conversion system (PCS). The PCS is in turn comprised of two inverters, each rated 1 MW/1.25 MVA. The company is also supplying its 15kV distribution switchgear.

Overall, S&C says the energy storage system will provide the two clients with four different revenue streams. "Revenue stacking is one of the quickest ways to create a strong return on investment for energy storage systems," said Troy Miller, director of grid Solutions at S&C. "In the case of the Minster project, we are seeing one of the first examples of how a municipal utility can work with a developer to create multiple revenue streams that benefit both parties, and we expect to see more projects like this in the future."

pv magazine has contacted S&C for more information.

Popular content

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Share

Related content

Elsewhere on pv magazine...

Leave a Reply

Please be mindful of our community standards.

Your email address will not be published. Required fields are marked *

By submitting this form you agree to pv magazine using your data for the purposes of publishing your comment.

Your personal data will only be disclosed or otherwise transmitted to third parties for the purposes of spam filtering or if this is necessary for technical maintenance of the website. Any other transfer to third parties will not take place unless this is justified on the basis of applicable data protection regulations or if pv magazine is legally obliged to do so.

You may revoke this consent at any time with effect for the future, in which case your personal data will be deleted immediately. Otherwise, your data will be deleted if pv magazine has processed your request or the purpose of data storage is fulfilled.

Further information on data privacy can be found in our Data Protection Policy.