Skip to content

Sunkind partners with JA Solar for 6.4 GW of PV manufacturing in India

Sunkind Energy has signed a strategic technical partnership with JA Solar to support its upcoming 2.4 GW solar cell and 4 GW module manufacturing facilities in India.

Premier Energies commissions 1.2 GW TOPCon solar cell line

The new line increases Premier Energies’ solar cell capacity from 2 GW to 3.2 GW. The Indian manufacturer is on track to scale this up to 8.4 GW by June 2026.

Premier Energies commissions 1.2 GW TOPCon solar cell line in India

Premier Energies has commissioned a 1.2 GW tunnel oxide passivated contact (TOPCon) solar cell line at Fab City in Hyderabad, India, increasing its total cell manufacturing capacity to 3.2 GW.

Indian state utility to deploy 1.07 GW of solar for irrigation

Maharashtra State Power Generation Co. Ltd. (MAHAGENCO) says it will commission 1.071 GW of solar under the Indian state’s Solar Agriculture Feeder Scheme 2.0 to supply daytime irrigation electricity to more than 300,000 farmers.

Sunkind Energy to build 4 GW solar module lines with ConfirmWare tech

Sunkind Energy has signed an agreement to use ConfirmWare’s stringer and automation equipment for 4 GW of solar module production capacity at upcoming manufacturing lines in India. The deal supports Sunkind Energy’s efforts to scale domestic module output amid growing demand and policy incentives.

Adani commissions off-grid 5 MW green hydrogen plant

Adani New Industries Ltd. (ANIL) has launched a 5 MW green hydrogen pilot plant in Kutch, India. The plant, powered entirely by solar and backed by battery storage, operates fully off-grid, marking a new step in decentralized, renewable hydrogen production.

SECI launches tender for 1.2 GW of solar with 600 MW/3,600 MWh of storage

Solar Energy Corp. of India (SECI) has launched a tender for 1.2 GW of solar projects connected to India’s interstate transmission system (ISTS), integrated with 600 MW/3,600 MWh of energy storage systems on a build-own-operate (BOO) basis. Bidding closes Aug. 20.

SECI launches tender for 1.2 GW of solar with 600 MW/3,600 MWh of storage

Solar Energy Corp. of India (SECI) has launched a tender for 1.2 GW of solar projects connected to India’s interstate transmission system (ISTS), integrated with 600 MW/3,600 MWh of energy storage systems on a build-own-operate (BOO) basis. Bidding closes Aug. 20.

Waaree Energies to move 6 GW solar module project to new sites in India

The board of Waaree Energies has approved plans to relocate its 6 GW ingot-to-solar module manufacturing facility from Odisha to multiple sites across Gujarat, Maharashtra and other Indian states. The shift aims to optimize infrastructure and logistics for the integrated project.

India’s solar potential estimated at 10.8 TW

A new study by the Energy and Resources Institute (TERI) has estimated India’s total solar potential at 10,830 GW, significantly higher than the previous 2014 assessment of 748 GW by the Ministry of New and Renewable Energy (MNRE). The study revisits conventional solar deployment areas such as barren and unculturable lands and explores additional avenues to expand the country’s solar potential.

2

This website uses cookies to anonymously count visitor numbers. View our privacy policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close