Huaneng has commissioned a 5 MW perovskite PV demonstration plant in China’s Qinghai province to test performance, durability, and environmental adaptability under high-altitude, high-UV conditions.
Germany’s Solyco has developed a 480 W back-contact solar module with 23.8% efficiency and a temperature coefficient of -0.26% per degree Celsius.
Scientists in Hong Kong have developed a patch that effectively cools down PV panels and utilizes waste heat for freshwater production. It has three layers: an atmospheric water harvester, a thermal regulation layer, and an adhesive layer. Maximum power density reportedly increased by over 28% in a folded version of the ultra-cooling patch.
This edition of the 3,000 km solar car race across Australia from Darwin to Adelaide has the same teams in the lead in the Challenger class since early on. Each has a 6 m2 solar deck but no two are exactly the same.
JA Solar has launched DesertBlue, a 650 W tunnel-oxide passivated contact (TOPCon) module for desert PV projects, featuring self-cleaning glass, reinforced frames, and heat-tolerant design with desert-specific certification.
The German state of Bavaria has commissioned a €4.2 million ($4.9 million) photovoltaic system along a 35-meter stretch of airport access road near Munich.
The National Renewable Energy Laboratory and Sandia National Labs have created a new nomenclature for PV connectors to reduce confusion amongst installers and developers, while improving deployment practices. They catalogued a sampling of twenty-five commercially available 4 mm connectors.
Bila Solar has introduced a 550 W solar module with a US-made steel frame through a partnership with Origami Solar, with the panels also using U.S.-made solar cells.
Chinese PV manufacturer Longi has launched a lightweight back-contact solar module for low-load commercial and industrial rooftops with limited structural load capacity.
India’s solar module manufacturing capacity has reached about 100 GW, meeting domestic demand, says SBICAPS. With total capacity rising to 190 GW by March 2027 amid limited export opportunities, the market faces oversupply risks.
This website uses cookies to anonymously count visitor numbers. View our privacy policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.