Acme Solar said the facility would use 3 GWp of solar and 0.5 GWp of wind energy to produce 2,400 tons of green ammonia daily and approximately 900,000 tons annually. Construction is planned in phases with an investment of $3.5 billion over the next three years.
Most of the generation capacity – around 190 MW – was deployed in the emirate between September 2019 and March 2021.
The news Lebanon installed new solar capacity last year has come as a huge surprise, given the country is at risk of failure. Amid the country’s crisis, solar is offering solutions.
Construction of the solar-plus-storage facility is scheduled to take place in the Negev desert in late 2021, with completion expected in 2023.
Blessed with some of the highest levels of solar irradiation in the world, the Middle East and North Africa (MENA) region has almost limitless potential for PV development. And while desert regions outside many of the region’s major cities already host some of the world’s largest PV installations, MENA has been a slower mover when it comes to rooftop solar. But that is set to change. In this pv magazine Webinar, we’ll take a closer look at Huawei’s latest offering for the rooftop market, the FusionSolar Residential Smart PV Solution, and why the Middle East will be a key region in the development of distributed solar in years to come.
Scientists in Saudi Arabia have conducted one of the longest tests on the stability of perovskite-silicon tandem solar cells. According to their findings, the most affected parameter under the hot and humid climate of the region is the device fill factor, which dropped from 80% to 50% in just six months.
Emirati utility DEWA has said it expects a further 517 MW of photovoltaic and CSP generation capacity to come online this year at the Mohammed bin Rashid Al Maktoum solar field, after the first, 300 MW slice of the fifth phase of the sprawling development was recently inaugurated.
The new headquarters planned by DEWA is intended to consume no more annual electricity than it generates, from a large volume of rooftop and building-integrated PV.
Three solar plants totaling 20 MW should be constructed at junctions located in Gedera, Beit Kama and Atlit.
The switch from fossil fuels and nuclear will bring a jobs dividend thanks to the greater labor-intensity of renewables plants, according to a paper published by Finland’s LUT. However, the jobs dividend is unlikely to be evenly spread around the world, with Europe set to be a big winner.
This website uses cookies to anonymously count visitor numbers. View our privacy policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.