The Cheer-Up project aims to enhance the performance of ‘upgraded metallurgical-grade (UMG) silicon for multi-crystalline solar cells and demonstrate it is a competitive alternative to polysilicon by achieving similar efficiencies at lower cost and with less environmental impact. Researchers also want to demonstrate UMG can be used to manufacture the most advanced cell structures.
Developed by Solum Photovoltaic Innovation, the recharging station is being powered by a 7.6 square meter, walkable photovoltaic pavement coupled to a 2-4 kWh storage system. This configuration is enough to repower 12 scooters per day.
Electricity bill payers in nations as diverse as Germany, Greece, India and China should be aware new solar projects can now generate electricity cheaper for them than legacy coal and gas-fired plants.
If the three record-busting low solar price tariffs recorded in the Middle East in the past 18 months are to be believed, renewables-powered hydrogen in prime sites in the region could already compete with gas-plus-CCS production, according to IRENA. Has the Gulf discovered the new petrol?
Repsol has switched on 90 MW of PV in Spain and Amazon wants to build another large scale solar facility in the country. Both projects are located in the central region of Castilla-La Mancha.
Acciona is testing four second-life batteries with a combined capacity of 130 kWh at its 1.2 MW experimental solar park in Tudela, in the Spanish region of Navarra.
The factory is located in Noblejas, in the province of Toledo, Castilla–La Mancha, and is planned to reach a capacity of 10 GWh by 2025.
The U.K.-based solar developer wants to identify potential buyers for the electricity generated by the facilities through competitive bidding.
The SFOne tracker is designed for modules with 72 and 78-cell designs. According to Soltec, it reduces the time spent in its installation by 75% and will be available in all markets where the company operates.
The investment has been planned as part of the nation’s recovery and resilience plan to access EU funds for its post-Covid economic stimulus package. The spending plans of Portugal and Greece have also been approved by the European Commission in the last 48 hours.
This website uses cookies to anonymously count visitor numbers. View our privacy policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.