Skip to content

Commercial & Industrial PV

European Parliament sets 24-month limit to approve renewables projects

The European Parliament has approved a 24-month limit for the approval of renewable energy projects, with a requirement that national authorities complete the process within 12 months for installations in “areas conducive to renewables” and within 24 months for projects outside of these areas.

1

French consortium plans 900 kW solar cycling path

A French consortium, led by the CNR (Compagnie nationale du Rhone), is launching a pilot project to build a 900 kW solar cycling path in southern France. The initiative, set to run from 2025 to 2028, aims to assess the performance and design of the PV facility.

How long do residential solar inverters last?

A range of different factors can affect the productive lifespan of residential solar inverters.

1

REC launches 470 W heterojunction solar panel with 22.6% efficiency

REC has developed a new series of heterojunction solar panels with efficiencies up to 22.6% and an operating temperature coefficient of -0.24% per degree Celsius.

The importance of solar mini-grids in universalizing energy access

In its latest monthly column for pv magazine, the International Solar Alliance (ISA) explains how to expand the deployment of mini-grids for electricity access, especially in less developed countries.

Agrivoltaic facilities with single-axis trackers have lower LCOE than those with fixed structures

New research from Belgium shows agrivoltaic facilities with trackers perform significantly better than projects with fixed structures. The scientists found projects with tracking achieved an LCOE of €0.077 ($0.082)/kWh, while facilities with fixed structures were found to have an LCOE of €0.10/kWh.

1

Real-time interface to reduce Netherlands’ grid congestion

All new PV plants over 1 MW in the Netherlands will have to use a real-time interface to make their facilities better communicate with the grid operator starting from next year. Utrecht-based Withthegrid, has developed an interface that is compatible with a number of brand-name inverters.

2

Bangladesh Jute Mills Corp. signs PPAs for 90 MW of rooftop PV

Bangladesh Jute Mills Corp. (BJMC), which manages all government-owned jute factories and industries in the South Asian country, has agreed to buy power from six different project developers under a 20-year power purchase agreement (PPA).

1

New control strategy for PV-powered water pumps operating under variable atmospheric conditions

Scientists in Turkey have developed a new algorithm to optimize the efficiency of PV-powered water pumps. The novel technique is based on the Extended Kalman–Bucy filter, which is a predictor-corrector algorithm used extensively in control systems engineering for estimating unmeasured states of a process.

PV-powered heat pumps with thermal, electrical storage

Italian researchers have looked at the potential of thermal and electrical energy storage to improve self-consumption rates in buildings when coupled with PV-powered heat pumps. They have concluded that such an approach could yield self-consumption rates of more than 80%.

3

This website uses cookies to anonymously count visitor numbers. View our privacy policy.

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close