Indonesia and Singapore have signed a memorandum of understanding to develop a solar manufacturing supply chain in Indonesia’s Riau Islands province, as part of broader plans to enable cross-border clean energy trading.
In a new weekly update for pv magazine, OPIS, a Dow Jones company, reports that US-assembled modules with imported cells continue to be heard between $0.26/W and $0.33/W, while modules with domestic content – which are still limited to just a handful of producers – are generally quoted between $0.4/W and $0.5/W.
To assess ion migration-induced degradation modes via accelerated ageing of perovskite solar cells, an international research team investiagted using electric forward bias and dark storage approach.
German researchers developed a novel pocket-sized instrument to rapidly identify the composition of solar panel polymer backsheets and encapsulants in the field. The hardware is near-infrared absorption spectroscopy (NIRA) sensor-based.
Solar module prices in Europe have fallen by up to €0.01 ($0.01)/W this month, according to pvXchange.com, as the PV market shows resilience amid policy uncertainty and geopolitical risks.
Solar cell manufacturer Indosolar will resume trading on Indian stock exchanges on June 19 after a six-year suspension, following approvals from the National Stock Exchange and Bombay Stock Exchange.
France’s New Imaging Technologies has launched a short-wave infrared line-by-line scanning camera for high-definition and high-performance silicon PV inspection systems.
China’s Trina Solar has unveiled a perovskite‑silicon tandem solar module prototype delivering 841 W and 27.1% efficiency, based on 210 mm tandem cells.
Researchers in Denmark claim to have identified the best locations for rear plane-of-array irradiance sensors on the back of single-axis trackers in bifacial PV projects. Their work suggests how to reduce sensor quantities while maintaining accurate performance monitoring.
INA Solar is building a 3 GW solar cell manufacturing line in central India, as part of a broader expansion that includes 4 GW of module capacity and aluminium frame production. It aims to begin construction by the first quarter of 2026 and start operations by mid-2027.
This website uses cookies to anonymously count visitor numbers. View our privacy policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.