From ESS News
Chinese-headquartered storage manufacturer AlphaESS has announced a new battery energy storage system (BESS), targeting the European commercial and industrial (C&I) sector.
Called Aster TB250/TB500, the new storage system is compatible with both 400V and 800V PV systems.
“This enables seamless integration into diverse electrical infrastructures without the need for additional transformers in many scenarios,” the company said in a statement. “To meet evolving energy needs, the system supports the parallel connection of up to 6 units, allowing projects to scale seamlessly up to 3 MW / 8.46 MWh.”
The system is packaged in a 20-foot container measuring 6,058 mm × 2,438 mm × 2,896 mm. It has a rated charging and discharging power of 250–500 kW, with energy capacities of 705-1,410 kWh.
The system uses liquid-cooled lithium-iron phosphate (LFP) batteries with an IP67 ingress protection rating, while the system as a whole has an IP55 rating. It also features a rate voltage of 400 V and a nominal power of 500 kW.
“The system features a multi-layered protection architecture from cell to system level, integrating advanced thermal management with module-level fire suppression,” the company added. “Furthermore, the system has successfully undergone the rigorous UL 9540A test at the pack level, demonstrating effective containment of thermal runaway.”
This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

By submitting this form you agree to pv magazine using your data for the purposes of publishing your comment.
Your personal data will only be disclosed or otherwise transmitted to third parties for the purposes of spam filtering or if this is necessary for technical maintenance of the website. Any other transfer to third parties will not take place unless this is justified on the basis of applicable data protection regulations or if pv magazine is legally obliged to do so.
You may revoke this consent at any time with effect for the future, in which case your personal data will be deleted immediately. Otherwise, your data will be deleted if pv magazine has processed your request or the purpose of data storage is fulfilled.
Further information on data privacy can be found in our Data Protection Policy.