Greenko’s 2.75 GW solar, wind, storage project approved in India

Share

Recognised as a mega industrial project, the Greenko wind-solar hybrid project has been allotted around 4,766 acres of land. However, the company must complete the project within a period of four years (48 months), failing which the entire land will be handed back to the government of Andhra Pradesh.

Read the full article on pv magazine India.

This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

BYD launches new residential battery
08 May 2025 BYD has launched its new Gen4 home battery known as HVB, and is expected to be a popular addition to the residential storage space.