A football club based in Oldham, Greater Manchester, has opened a tender for the supply and installation of a 80 kW solar array alongside 40 kW of battery storage. The deadline for applications is November 30.
Turkey’s latest renewable energy tender received 77 applications from 38 different companies across eight available solar projects, including the country’s first floating PV plant. Winners will be announced before the end of the year.
Scientists in India have developed a novel method to optimize the placement of an EV charging station on the grid, along with the size of its PV generation and battery storage. They have also created a framework for an innovative slot offering.
The C&I One-Fits-All Solution and FusionCharge Solution offer versatility for a wide range of scenarios in the commercial and industrial market.
Viridian Solar, a UK-based roof-integrated solar PV specialist, announced new flashing products to seamlessly integrate its solar panels with skylight-style windows made by Keylite Roof Windows.
The US Consumer Product Safety Commission (CPSC) says EcoFlow is recalling about 25,030 Delta Max 2000 power stations after six reported fires caused more than USD 850,000 in property damage.
The International Energy Agency (IEA) says that Australia installed 5.2 GW of solar capacity in 2024, bringing the national total to 40 GW across distributed and utility-scale systems.
Ministers in Luxembourg have agreed to allow the installation of solar systems alongside motorways and bypasses in road networks after an independent study estimated it could support up to 1.5 GW of new solar capacity.
In a new scientific paper, the Chinese solar manufacturer explained that the 27.81%-efficient hybrid interdigitated back-contact cell it unveiled in April is based on passivated tunneling contacts and dielectric passivation layers, while also incorporating both n-type and p-type contacts.
The Solar Energy Industries Association (SEIA) says new federal permitting, tax, and grant policies place more than 13,000 MW of planned solar and battery capacity in Texas at risk of failing to come online in 2026, with far larger volumes exposed in 2027.
This website uses cookies to anonymously count visitor numbers. View our privacy policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.