Guosheng says it will invest CNY 5.2 billion ($722 million) in a new 10 GW heterojunction (HJT) solar cell production facility.
Ascent Solar, a US-based manufacturer, has achieved an efficiency of 17.55% for its copper, indium, gallium and selenide (CIGS) technology. It says it plans to release a new CIGS solar module with this efficiency rating soon.
A Wood Mackenzie report forecasts that China will hold more than 80% of poly, wafer, cell and module manufacturing capacity for the next three years.
NTPC, an Indian state-run power producer, recently tendered 3 GW of renewable storage and an engineering, procurement and construction (EPC) package for 630 MW of solar projects.
Portuguese police today raided the residence of the country’s Prime Minister, António Costa, as part of a corruption probe involving lithium and hydrogen. Ministers of Climate Action and Infrastructure, Duarte Cordeiro and João Pedro Matos Fernández, have also been declared formal suspects.
Conducted by Italian scienitists, the analysis includes standards such as IEC 61727, the US EREC G83/2 Recommendations, Germany’s VDE-AR-N 4105, China’s GB/T 19964-2012 and GB/T 20,046, Italy’s CEI 0-21, Australia’s AS 4777.2, and New Zealand’s AS 4777.2 standards, as well as the United States’ IEEE 1547.
Genex Power, the owner of a 50 MW/100 MWh battery system that caught fire in the Australian state of Queensland on Sept. 26, says the blaze was triggered by issues on the grid side of the Tesla Megapack battery unit.
The Italian market set a record high of 846 GWh of wind energy generation during the first week of November. Meanwhile, European electricity demand decreased over the same period and the MIBEL market registered 19 hours of €0.00/MWh ($0.00/MWh) prices.
An international research group has assessed the economic feasibility of exclusively powering remote villages in Pakistan with off-grid solar-plus-storage projects. They said that their proposed system configuration has a “justifiable” net present cost.
NHPC has allocated 3 GW of solar capacity at a rate of $0.030/kWh to developers who can set up projects connected to the interstate transmission system across India.
This website uses cookies to anonymously count visitor numbers. View our privacy policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.