Porsche has revealed a battery energy storage system (BESS) at its Leipzig powered by second-life Porsche Taycan batteries. The project is based on a feasibility study in collaboration with the University of Applied Sciences Zwickau in Saxony, Germany.
JinkoSolar has begun converting its production to n-type tunnel oxide passivated contact (TOPCon) products to stay competitive, says Frank Niendorf, the company’s general manager for Europe. He predicts that several market players in the value chain will exit the market soon.
The US solid-state battery developer announced it has achieved 800 cycles with its battery, marking significant progress towards commercialization. If this trend continues, the development holds promising potential for grid-scale projects.
In the north of Scotland, multiple new BESS projects are under consideration by the local council, two at up to 200 MW, along with a 49.9 MW project.
New research from the UK shows that Oman could utilize a floating PV farm at the Wadi Dayqah Dam for hydrogen generation. The scientist said the project is technical viabile, although only with advancements in hydrogen energy storage technology could make it economically feasible.
Two Ukrainian hospitals recently hosted inauguration ceremonies for hybrid solar and storage systems that have been installed through an initiative spearheaded by the RePower Ukraine Charitable Foundation.
Half year data from UK certification body MCS reveal a step change in the number of heat pump installations in 2024, as well as a record breaking first six months for battery storage installations. At the current rate, the annual heat pump installation record will be broken by the end of 2024
A utility-scale battery delivery overturned on a highway after the truck carrying the batteries collided with a car, overcorrected, tipped to the side and dumped its cargo, leading to a fire that lasted more than 24 hours.
The Portuguese Ministry of Energy has allocated €99.75 million ($107.6 million) for grid flexibility and energy storage projects which should be installed by the end of 2025.
Australia has firmed as the world’s fourth-largest market for utility scale batteries with new data from research consultancy Rystad Energy revealing that almost 3 GW / 8 GWh of battery energy storage projects have started construction in the first seven months of 2024.
This website uses cookies to anonymously count visitor numbers. View our privacy policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.