In a new weekly update for pv magazine, Solcast, a DNV company, reports that Storm Claudia significantly reduced daily irradiance across the British Isles and the Iberian Peninsula, limiting solar generation.
Enowatt says its modular, demountable photovoltaic structures allow companies to deploy solar capacity on existing sites without major building reinforcement, using ballasted units that install directly on asphalt.
Spanish manufacturer Sumcab says its new ToughGround and Overground cables are designed for underground and overhead photovoltaic systems throughout the world, offering durability, rapid installation, and a 30-year lifespan.
Italian research agency Enea has created a web tool that assesses the feasibility of replacing residential gas boilers with heat pumps by providing an estimate of the potential energy and economic savings. The app also provides information on the technical specifications of the photovoltaic system necessary to meet the heat pump’s electricity demand.
Austria added 1,036 MW of new solar capacity between January and September 2025, down from 1,419 MW over the same period in 2024, as political uncertainty, delayed legislation, and weakening residential demand strain the solar sector.
The Chinese manufacturer said the higher-voltage design of the new module reduces cable, combiner, pile-foundation, and land-use requirements, delivering balance-of-system savings of up to CNY 0.15 ($0.012)/W in western China. The module offers a power output of 730 W to 770 W and a conversion efficiency of up to 24.8%.
The new 12.5 kWh pack-based design supports flexible configuration up to 250 kWh per system. An optional long-duration combiner box supports 2–4 clusters, expandable to 1,000 kWh and 8 hours of storage.
Latest government figures record 20.7 GW deployed PV capacity at the end of October 2025, up 10.4% in a 12-month period. Surge in contracts for difference (CfD) supported connections recorded in 2025 with more large ground-mount projects in the pipeline.
The International Renewable Energy Agency (IRENA) is seeking a consultancy to conduct a feasibility study for a utility-scale solar plant in Ukraine, with applications due Dec. 23.
The 6.55 MW project, hailed as the world’s first grid-connected, solar rooftop project within a social housing community, equipped almost 2,000 houses with solar panels.
This website uses cookies to anonymously count visitor numbers. View our privacy policy.
The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.